With over 70,000 joints (~57,700 MT) run in the field, VAM® EDGE SF+ is extensively used as production casing in US shale plays (Haynesville, Permian, Eagle Ford).
“This high-performance solution allows us to set intermediate strings at least 2,000 feet deeper with maximum clearance. Extensive teamwork produced a customized yet cost effective design without sacrificing excellent performance.”
A Permian Operator