“A leading operator consulted with us to help identify cost savings. We deployed VAM® best-in-class processes to limit operational waste and optimized operation sequencing with a unique focal point. This helped reduce the number of operations in the buffer zone and on the critical path. The result: 40% less TMS cost per well, 40% fewer man hours at the rig and a 20% gain in running efficiency, for significant TMS savings.”