Enhanced Reliability
Accurate data significantly improves cement plug bump reliability and successfully installs packer setting from the first attempt.
Cost Saving
Actual bore volume mitigates waste from the perforation zone in production casing wells due to cement left in-hole, & saves time and cost when drilling cement in the next section.
Boost operational performance
Running on top of Rig Preparation or Rig Return services, ID map shows and compares your string condition, helping to evaluate wall loss due to corrosion or casing wear.